Fyshwick Sewage Treatment Plant: Lagoon Renewal and Hydromud Management Project

Project Overview

We are planning upgrades at our Fyshwick Sewage Treatment Plant (FSTP) to support the ongoing operation and reliability of the facility.

The project involves:

  • Renewing ageing embankments around the treatment lagoons
  • Building a facility to manage and reuse material collected during water and sewer maintenance
  • Improving internal access roads and other infrastructure within the treatment plant.
  • The upgrades will extend the life of important infrastructure, make the site safer and easier to operate, and reduce the amount of reusable material sent to landfill.  

The upgrades will extend the life of important infrastructure, make the site safer and easier to operate, and reduce the amount of reusable material sent to landfill.  

Why is this work needed?

Renewing the treatment lagoons

The FSTP treatment lagoons have been operating for more than 60 years. Some of the embankments, which are raised earth walls around the lagoons, have deteriorated because of age and erosion. They need to be renewed so they remain safe and reliable.

The work will:

  • strengthen lagoon embankments
  • improve access for plant operations and maintenance
  • reduce the risk of future embankment failure.  

Managing and reusing hydromud

We use hydrovac trucks to maintain and repair Canberra's water and sewer networks. These trucks use pressurised water and vacuum equipment to safely excavate around underground pipes.  

This work produces a wet mixture of soil, water and other material known as hydromud.

The proposed new facility will allow us to dry and test this material. Material that meets the required safety and quality standards may then be reused instead of being sent to landfill.

This supports our commitment to recovering useful resources, reducing waste and keeping suitable materials in use for longer.

Development Application

We have lodged a Development Application for the proposed Hydromud Management Facility. The Development Application has now been released for public viewing and can be viewed here.

Construction of the facility will be subject to the required planning and environmental approvals.

Protecting the environment

We completed environmental studies to understand the plants, animals and habitats in and around the project area. These studies included ecological surveys and fauna assessments.

The surveys recorded a range of bird and wildlife using the site, no threatened or migratory bird species were recorded during the surveys.

Environmental protection measures will be in place during construction. These measures will include controls to:

  • protect nearby wetlands and surrounding habitats
  • manage erosion and sediment
  • reduce the risk of pollution
  • rehabilitate areas affected by construction. 

Construction timing  

Subject to planning and other approvals, construction is expected to start in late 2026 and continue until Q3-2027.

We will provide updated timing before construction begins.

What might the community notice?

The work will take place within the existing FSTP site. During construction, nearby businesses and people travelling through the area may notice:

  • more construction vehicles entering and leaving the site
  • Increased activity within the treatment plant
  • temporary stockpiles, machinery and construction equipment.  

We expect work to take place during standard construction hours. We will work with the construction contractor to reduce impacts on nearby businesses and the surrounding area. 

Working with the community

We will keep nearby businesses, community groups, environmental organisations and government agencies informed as the project progresses.

We will also share updates about planning, construction timing and activities that may affect the surrounding area. 

FAQs

Expand All |
Collapse All

Will this project expand the sewage treatment plant?

No. The project will renew existing infrastructure and improve facilities within the existing Fyshwick Sewage Treatment Plant site. It will not expand the plant’s treatment capacity or site boundary. 

Why is the lagoon renewal required?

The lagoon embankments are more than 60 years old. Some sections have deteriorated because of age and erosion. 

What is hydromud?

Hydromud is a wet mixture of soil, water and other material collected when we maintain and repair Canberra’s water and sewer network.  

It is produced by hydrovac trucks, which use pressurised water and vacuum equipment to safely excavate around underground pipes.

The new facility will allow the hydromud to be dried and tested. Material that meets the required safety and quality standards may then be reused instead of being sent to landfill. 

Will the project cause more odour?

The project is not expected to cause a noticeable increase in odour around the site.

The works involves renewing existing infrastructure and building a facility to manage hydromud within the operating sewage treatment plant. 

Will there be more traffic?

There may be more construction vehicles, including trucks, entering and leaving the site during some stages of construction.

We will work with the construction contractor to manage vehicle movements and reduce impacts on nearby roads and businesses.

We will provide more information about construction traffic and timing before work begins. 

Will local wildlife be affected?

The project is not expected to have a significant impact on threatened plants, animals or ecological communities.

Environmental specialists have surveyed the site and surrounding area to help identify and manage potential impacts. Measures will be in place during construction to protect wildlife, nearby wetlands and surrounding habitats. 

What environmental protection measures will be used?

Environmental protection measures will be used throughout construction. 

These will include:

  • controlling erosion and sediment
  • checking that environmental safeguards are working
  • protecting wildlife and nearby habitats
  • reducing dust and the risk of pollution
  • rehabilitating areas disturbed by construction.

We will work with environmental specialists and relevant stakeholders to monitor and manage potential impacts. 

When will construction take place?

Subject to planning and other required approvals, construction is expected to begin in late 2026 and continue until Q3 2027.

We will provide updated timing before construction begins.

 


We’re always happy to help
For general enquiries, you can contact us directly at talktous@iconwater.com.au. Our team will do their best to respond within 24 hours. 

If you need a bit more assistance, or just prefer talking to a person, 
you can call us on (02) 6248 3111 (select option 3).