Skip to main content

Consultation on proposed updates Class A unit metering standards

What is this consultation about?

Legislation in the ACT requires individual water meters in new Class A and Class B units.

Icon Water is implementing these requirements through the technical requirements, drawings and supporting processes.
Icon Water is seeking feedback on Class A requirements incorporated in the updated STD SPE M 006 Property Service Connections and Water Meters and associated standard drawings (SDs).  

Existing Class B requirements are already in effect and are not part of this consultation. ACT legislative requirements are also outside the scope of this consultation.

Expand All |
Collapse All

Attend a webinar or workshop

Icon Water will be holding two public webinars to introduce the consultation documents, explain the proposed updates and provide details about how you can participate and provide feedback.

Webinars (open to all stakeholders)

Webinars will provide an overview of the proposed updates and explain the consultation process.

  • Monday 27 July, 8:30 – 9.30 am
  • Wednesday 29 July, 3 – 4 pm  

Register for a webinar

Technical workshops

We are also holding a series of technical workshops to discuss the proposed updates in more detail. If you are interested in attending a workshop, please contact us as letstalkwater.wastewater@iconwater.com.au and we’ll help you find the most appropriate session. 

Draft standard and standard drawings for consultation

The following draft documents are available for review:

These documents are provided in draft form for consultation purposes.

Provide feedback

Feedback should reference specific sections or drawings, where possible, and be submitted using the consultation feedback form.

What we’re seeking feedback on

This consultation focuses on:

  • updates to Section 5 of STD-SPE-M-006 Requirements for Property Service Connections and Water Meters
  • the three draft Class A standard drawings in the SD 3370 series
  • whether the proposed requirements are practical, clear and fit for purpose.

What’s out of scope for feedback

  • Legislative requirements mandating individual unit metering for Class A and Class B developments
  • Content within STD-SPE-M-006 that is outside Section 5
  • Other Icon Water standards and Standard Drawings not included in the consultation package
  • Billing system and processes, Icon Water systems and processes, or broader program delivery arrangements (except where explicitly addressed in Section 5). 
Expand All |
Collapse All

The consultation timeline and process

The consultation feedback period opens 20 July until 13 September 2026.  

After the feedback period closes, we will:

  • review feedback
  • refine the proposed standards and supporting drawings, where appropriate
  • invite stakeholders to review the consultation report  
  • finalise and publish the updated standards and a ‘What we heard, what we did and why’ report.

How to provide feedback

Submit your feedback using the online consultation feedback form below.

Provide feedback

If you’re unable to use the online form, you can also submit feedback by:

     Class A unit metering standards consultation  
     Icon Water 
     PO Box 50 
     Mitchell ACT 2911

Postal submissions must arrive before 5pm on 13 September 2026.  

Questions? Contact letstalkwater.wastewater@iconwater.com.au

Who should provide feedback?

We encourage feedback from anyone involved in planning, designing, constructing, approving, managing or maintaining developments where unit metering standards apply, with a focus on updates relating to Class A developments, including:

  • developers and builders
  • architects, hydraulic consultants and engineers
  • plumbers and certifiers
  • body corporate and strata managers
  • construction industry associations and government stakeholders.

You are not required to attend a webinar or workshop to participate in the consultation.

How we’ll consider your feedback

All feedback submitted through the online form, via email or post will be considered by Icon Water subject matter experts.

Following consultation, Icon Water will review feedback alongside legislative requirements, technical standards, safety, access, maintenance and customer billing considerations.  

A summary of consultation outcomes explaining what we heard, what we did and why, will then be published for stakeholder review.  

Following the stakeholder review process, the draft standards and drawings may be further refined before they are finalised and published.